02 9683 9000 Mon-Fri 08:00-17:00 Level 1, 407 Church St Nth Parramatta NSW 2151 (entry on Grose St)
View Rapid Construction Pty Ltd profile on Ariba Discovery
Safety
ISO45001:2018
Quality
ISO9001:2015
Environment
ISO14001:2015
View our certifications

Fire & Life Safety Systems - Tunnel Asset Maintenance, Cleaning & Refurbishment

City Underground & Eastern Suburbs Line Tunnels, Viaducts and Portals, Harbour Bridge, North Sydney to Waverton, Olympic Park Loop Line, Illawarra Line and all tunnels north from Sydney to Newcastle. In November 2011 Rapid Construction Pty Ltd was awarded the Fire & Life Safety Assets Cleaning and Maintenance Contract for the first time. The original contract covered fabrication, preventive maintenance, repairs and full cleaning to all fire and life safety assets in the City Underground and Eastern Suburbs Railways, extending north across the Harbour Bridge to North Sydney and Waverton stations, south through to Erskineville and also including the Olympic Park loop line. We completed this contract in March 2012, with the work being awarded to us regularly since then. Three hundred and forty three train-to-track ladders are cleaned, alongside 343 track platforms and 51 track-to-platform ladders, and track to bike path ladders on the Harbour Bridge, with additional items being cleaned and maintained including safe place refuges, phones, through-bars, hand-holds, orange/blue/white indicator lights, exit signs, instructional signs, sign lights and phone signs. Our team additionally provides a rubbish picking service with in excess of 12,500 litres of rubbish collected during the 2013 contract alone. All works are completed during week night track possessions, commencing after 9pm and finishing around 3am. We deploy qualified tradespeople on all work and deliver additional running repairs during the work, for example to broken and failing pedestrian track crossings in the tunnel system. Rapid is currently delivering this periodic maintenance work during weeknight possessions. Design and Fabrication of new ladders and platforms forms a part of more recent contracts with an expansion of the project to include the Illawarra tunnels and all the tunnels between Sydney and Newcastle. Access to these areas is achieved via a variety of Hi-Rail Plant as well as the occasional barge and water taxi.

ClientSydney Trains
LocationGreater Sydney Metro Sydney Trains network
Value$400k per delivery
Duration12 weeks per delivery
FrequencyDelivered annually or bi-annually since 2011
Tags,